Kerb & channelto line and level.
New kerb, driveway laybacks and reinstatement built to meet the road, crossing and drainage properly. Mascon brings ten years of inspected council concrete work to residential, builder and commercial jobs.
Kerb work that connects properly
Kerb & channel
New runs and replacement sections, formed or machine-laid to the required profile, line and drainage level.
Driveway laybacks
Kerb transitions for new, widened or replacement vehicle crossings, tied cleanly into the existing channel.
Kerb reinstatement
Redundant laybacks removed and standard kerb reinstated where a crossing is relocated or taken out.
Pits & drainage tie-ins
Kerb and channel finished around pits, spoon drains and frontage levels so water follows the intended path.
Set out for the assets around it
- Existing kerb profile, channel level and drainage fall checked
- Crossing, footpath, pits and road edge coordinated together
- Formwork and base ready before the inspection or pour
- Concrete finished and jointed to the relevant specification
- Traffic and pedestrian access managed for the work area
- Clean tie-ins and site handover when the work is complete
Recent kerb, channel & laybacks
From one layback to a works programme
Homeowners
Kerb and layback work attached to a new, replacement or widened vehicle crossing.
Builders & developers
A concrete subcontractor for the crossover, kerb, footpath and council-interface portion of the build.
Council & commercial
Maintenance and capital works with SWMS, WorkCover, public liability and traffic management documentation.
Need kerb or layback work quoted?
Call or text a photo of the job and a rough address — you'll get a straight answer on price and timing.